Rail Coordination Application Area

Description

This center-to-center application area covers the interface between a traffic management center (TMC) and a rail operations center. The interface supports the following exchanges:

This graphic shows the scope of the Center to Center Rail Coordination application area.  This scope is described in the preceding text.

National ITS Architecture Interface

This application area includes the interface between Rail Operations and the Traffic Management Subsystem (TMS). Rail Operations provides the TMS with train schedules, maintenance schedules, and other information concerning upcoming highway-rail intersection (HRI) closures. Rail Operations uses this interface to notify the TMS when a rail incident, stalled train, or some other obstruction may impact vehicle traffic. This impact could be the blockage of an HRI or it could be something happening near a roadway that may impact traffic. In turn, the TMS provides information to Rail Operations concerning HRI equipment failure, intersection blockage, highway incidents, or maintenance activities at or near an HRI that might interfere with the safe operation of passing trains. Finally, the health and/or status of the wayside equipment and field equipment can be shared between the centers.

Includes Architecture Flows:

Source Architecture Flow Destination
Rail Operationsrailroad schedulesEmergency Management
Rail Operationsrailroad advisoriesTraffic Management
Rail Operationsrailroad schedulesTraffic Management
Traffic Managementhri advisoriesRail Operations

Applicable Standards